P1 · CHAPTER 02 · 90-DAY EXPERIMENT

90-day experiment for “The Deployment Gap

Test “The Deployment Gap” through a small, reversible 90-day experiment. The objective is evidence and reusable learning, not proving the book right.

WORKBOOK SEQUENCE

  1. 01

    State the practical hypothesis suggested by: The models can already do far more than the world has bothered to use them for. That gap is the opportunity.

  2. 02

    Choose one observable signal from each theme: The Machine Arrives Before the System; Capability Has Outrun Habit; Why Organizations Move Slowly; The Work Already Within Reach; The Last Mile Is the Real Bottleneck; Electrifying the Old Workflow; The Economics of Unused Capability; Why the Gap Feels Like Disappointment; The People Who Close Gaps; The Better Kind of Early.

  3. 03

    Set a baseline, weekly action, success threshold, cost ceiling and explicit stop condition.

  4. 04

    Review at days 30, 60 and 90; preserve useful examples, distribution or evaluation assets even if the hypothesis fails.

EXPECTED OUTPUT

Leave with a decision artifact.

A 90-day experiment brief with baseline, weekly cadence, thresholds, checkpoints and a final keep/change/stop decision.